This week my father and I are over in the house for seven days, this will actually be the longest time we have spent here in one swoop and it’s borne out of the frustration that my wife and I have that we just can’t tinker with stuff on the odd weekend.
A quick recap :
While we are finalising the plans for the house we are working on a “Petit Renovation” first. The house in it’s current layout had somewhat of a “livable” area consisting of Kitchen / Lounge, Shower room and 2 bedrooms both approx 11ft x 10ft each, however given the actual state of disrepair to all of them we really needed to fix up these area’s so we can comfortably stay in the house for holidays etc etc, and that by itself is no small task. Welcome to our “Petite Renovation”
The plan for the week is quite ambitious and we have a LOT to get through. This is actually Renovation Week 1 of 2 with the next week we are out here being Easter however this is the week where we must try and get things done to the bathroom as the wife can’t be without a toilet or at the very least a toilet door. Me and my father can just resort to being Neanderthals when needed
Plan for the week:
Bathroom
Remove and replace the bathroom. Everything in it from the WC to the 1/2 Bath / Shower need to be replaced. There is the option to level the floor and retile as well as remove and replace the awful foam square polystyrene ceiling and insulate.
Kitchen
Fit a kitchen of use! The “kitchen” as it is right now is a sink and a mobile gas cooker. A small kitchen has been purchased along with a new sink, natural gas hob and work top. This will enable us to have a functioning kitchen so we actually stop eating items cooked in one small saucepan and one small frying pan.
Plaster
The walls in the house are either covered in yellow stipple pain / artex or wood cladding. You by now have already seen the images of the walls we bought back to their original stone, and the plan is to finish this off where we can and then plasterboard, seal and paint the rest to create a clean space.
Fireplace
Rescuing the fireplace is one of the items that is on the top of my list that really shouldn’t be. This house has stood for over 300 years and the fireplace is very big, functional and the large stones used to create it have been painted over in yellow stipple paint and it angers me every time. While this is not urgent (as the fireplace works) this is on my hit list.
Rewire
I could write about the electrics in the house all day. Needless to say that they are badly done and very unreliable. While we re-plaster we’ll be relaying cables & adding data cabling as well. Given the ease of the French system of “Spurring” and the small size of the “Petite Mason” this actually sounds harder than it should be.
Plumbing
See above - but just replace electricity with water! Everything is either bursting, pained or ready to rot. I’m looking forward to this as it gives us the chance to replace it when we fit the new bathroom and sink. Also some isolation values would in the past have been great as at present the water is either on or off to everywhere.
So you can see there is a LOT planned for 1 week, however we do have another week here in 3 weeks time but this is the week of long days, dirty work and no doubt a bit of swearing. Oh and of course I’d better let you know my budget: €2000 sounds fair
Drop in all week for running updates and photo’s ( there will be LOTS )